Use the drawing that matches your tunnel length. Each one shows where every under roller sits along the conveyor frame. The tables under each drawing list the glide plates, frame sections and under roller kit quantity.
Match the under roller to your belt
The under roller and spacing on these drawings, P/N P-C2396-A, are specific to CB1 and CB2 belts. If your site runs an CB3 belt, use under roller P/N P-C2467-K on the driver side (DS).
Drawings by tunnel length
90 ft tunnel
Conveyor 73' + 6" gap · Pit 73'-6" · 32 under roller kits
PDF: 90ft Stainless Conveyor Assembly.pdf (attached below)
110 ft tunnel
Conveyor 93' + 6" gap · Pit 93'-6" · 40 under roller kits
PDF: 110ft Stainless Conveyor Assembly.pdf (attached below)
130 ft tunnel
Conveyor 113' + 6" gap · Pit 113'-6" · 48 under roller kits
PDF: 130ft Stainless Conveyor Assembly.pdf (attached below)
All three drawings are Rev. 1, released Aug. 14, 2025.
Not sure which belt you have? Contact Equipment Support before you order under rollers.