The reclaim underbody retro-fit kit will allow non-WTC sites to be able to use reclaim water on their
underbody flush instead of using reject water. This will save on water consumption by reusing reclaim
water.
Project Background:
Provide a brief summary of the 5 W’s here. Why, what, where, when. What will it replace if applicable.
What is recommended ect.
Why: Reduce water usage
Who: Project Lead: Kevin Schierbeek
What: Where: Underbody flush
When: Added at any time
Criteria:
- New feed line needs be run from the back room, down the conveyor pit to manifold location.
Underbody manifold needs to be relocated out from under Combo 1 to under rainbow coat. New
wires will need to be connected from MCP1 to valve on AIO.
How to Order:
- Request kit on webstore
Parts Affected
- Underbody manifold w ill need to be relocated out from under Combo 1
COST
Appendix A