Recommended Interval:
- Every 3 months or upon failure
Parts Needed:
- Blue foot valve (P-CHE-2003)
- Stainless steel weight (P-WAT-2106)
- Superthane Ether/Presoak draw line (P-CHE-2163)
Tools Needed:
- Safety glasses and gloves
- Tubing cutter
Procedure:
- Put on gloves and safety glasses.
- Open detergent tote and retrieve the bottom of the draw line.
- Carefully remove foot valve and stainless steel weight.
- Drop draw line back into the detergent tote and loosen the draw line grip fitting.
- Remove Draw line from injector, and pull from tote fitting, allowing all detergent in the line to drain back into tote.
- Insert a new section of draw line into draw line grip fitting, then install new foot valve and stainless steel weight.
- Push draw line down so the foot valve is laying on the bottom of the tote.
- Cut new draw line to length, and reconnect to injector.
- Test the function.